Civil Engineer Tommy Aldmeyer (left) and Structural Engineer Jeffrey Schulz, U.S. Army Corps of Engineers, Omaha District, discuss findings following the inspection of the outlet conduit for the Branched Oak Dam located north of Lincoln, Nebraska, June 2, 2025. The conduit carries water through the dam during water releases. A periodic inspection of the dam is conducted every five years to identify potential defects and to ensure the dam is functioning as designed. The dam is one of 10 Salt Creek dams that work together to reduce flood risk for the city of Lincoln and surrounding communities. (U.S. Army Corps of Engineers photo by Delanie Stafford)
Date Taken: | 06.02.2025 |
Date Posted: | 06.06.2025 14:49 |
Photo ID: | 9090119 |
VIRIN: | 250602-A-KS317-1014 |
Resolution: | 3300x2178 |
Size: | 4.21 MB |
Location: | US |
Web Views: | 1 |
Downloads: | 1 |
This work, Omaha District Dam safety inspection season in full swing [Image 20 of 20], by Delanie Stafford, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.