The Painted Rock Dam water release is pictured March 25 near Gila Bend, Arizona. The north-facing dam is a major flood control project in the Gila River Drainage Basin, constructed and operated by the U. S. Army Corps of Engineers Los Angeles District. (Photo by Robert DeDeaux, USACE Los Angeles District Public Affairs)
| Date Taken: | 03.25.2024 |
| Date Posted: | 04.10.2024 19:43 |
| Photo ID: | 8333509 |
| VIRIN: | 240325-A-RY318-1005 |
| Resolution: | 4032x3024 |
| Size: | 4.15 MB |
| Location: | GILA BEND, ARIZONA, US |
| Web Views: | 36 |
| Downloads: | 5 |
This work, Water Release [Image 8 of 8], by Robert DeDeaux, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.