(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Tulsa District constructs alternate care facilities for the state of Oklahoma [Image 3 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A worker wearing a bright green t-shirt is working overhead among a large, tangled mass of cables and wires suspended from a ceiling grid. The setting appears to be a building under construction or renovation, with exposed brick walls, drywall framing, and an open ceiling. The worker appears to be organizing or installing network/data cables and electrical wiring.

    An electrical contractor works on wiring in the ceiling during construction efforts of an alternate care facility at Oklahoma State University Medical Center, Tulsa Okla., May 6, 2020. While working on a FEMA mission assignment at the request of the state of Oklahoma, the Tulsa District executed planning, assessment, design and construction missions supporting state requests for two alternate care facilities. Four floors of the OSU Medical Center in Tulsa Okla., were remodeled providing an additional 116 beds and Integris Baptist Portland Campus in Oklahoma City Okla., providing an additional 110 beds. USACE has the capability and expertise to adjust alternate care facility designs between COVID and non-COVID, depending on states’ needs for specific site locations. The estimated 14 day construction process began at both facilities on April 27, 2020. (Released/U.S. Army Photo by Preston L. Chasteen)

    IMAGE INFO

    Date Taken: 05.04.2020
    Date Posted: 06.10.2020 14:12
    Photo ID: 6237097
    VIRIN: 200506-A-IF821-0017
    Resolution: 5472x3648
    Size: 9.42 MB
    Location: US

    Web Views: 23
    Downloads: 2

    PUBLIC DOMAIN