Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Stanford Run concrete box culvert installation [Image 3 of 7]

    Stanford Run concrete box culvert installation

    U.S. Army Corps of Engineers Buffalo District contractors install a concrete box culvert at the Stanford Run ecosystem restoration project at the Cuyahoga Valley National Park in Summit County, Ohio, February 2019.

    Ryba Marine Construction Co. installed a new box culvert under the Towpath Trail that is sized to accommodate present-day storm flows and restored a major portion of the stream, including planting native trees and shrubs along the stream banks.



    Photo provided by Christopher Davis.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 10.17.2019
    Date Posted: 02.25.2020 10:14
    Photo ID: 6113566
    VIRIN: 191017-A-PG036-009
    Resolution: 1631x973
    Size: 1.28 MB
    Location: US

    Web Views: 40
    Downloads: 2

    PUBLIC DOMAIN