Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Danish Engineer Corps builds foot bridge within Black Hills [Image 5 of 5]

    Danish Engineer Corps builds foot bridge within Black Hills

    SPEARFISH, SD, UNITED STATES

    06.14.2016

    Photo by Pfc. joshua quandt 

    129th Mobile Public Affairs Detachment

    (From left to right) Sgt. Paw Vinther, Lance Cpl. Abel Frederikson and Lance Cpl. Hans Peter Loehr from the Danish 3rd Battalion Engineer Corps inspect a newly secured support beam for a foot bridge near Spearfish Falls in Spearfish Canyon, S.D., June 14, 2016. This Bridge will reopen access to one of the many hiking trails in Spearfish Canyon for tourists.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 06.14.2016
    Date Posted: 06.18.2016 13:20
    Photo ID: 2671117
    VIRIN: 140616-Z-TD942-022
    Resolution: 5184x3456
    Size: 2.72 MB
    Location: SPEARFISH, SD, US

    Web Views: 20
    Downloads: 3

    PUBLIC DOMAIN