Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Danish Engineer Corps builds foot bridge within Black Hills [Image 2 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Danish Engineer Corps builds foot bridge within Black Hills

    SPEARFISH, SOUTH DAKOTA, UNITED STATES

    06.14.2016

    Photo by Pfc. joshua quandt 

    129th Mobile Public Affairs Detachment

    Danish 3rd Battalion Engineer Corps Soldier Sgt. 1st Class Jesper Tandrup (left), gives direction to Lance Cpl. Bo Andreasen (middle) and Lance Cpl. Abel Frederikson (right) while they remove cross beams from a bridge at Spearfish Falls in Spearfish Canyon, S.D., June 14, 2016. The bridge will connect a hiking trail that will provide access to the falls.

    IMAGE INFO

    Date Taken: 06.14.2016
    Date Posted: 06.18.2016 13:20
    Photo ID: 2671112
    VIRIN: 140616-Z-TD942-001
    Resolution: 5184x3456
    Size: 3.23 MB
    Location: SPEARFISH, SOUTH DAKOTA, US

    Web Views: 22
    Downloads: 2

    PUBLIC DOMAIN