Lance Cpl. Abel Frederikson and Sgt. Paw Vinther of the Danish 3rd Battalion Engineering Corps prepare to remove temperary planking on a bridge being built in Spearfish Falls in Spearfish Canyon, S.D., June 15, 2016. The Bridge will reopen the trails for tourists to have access to the falls.
Date Taken: | 06.14.2016 |
Date Posted: | 06.18.2016 13:20 |
Photo ID: | 2671114 |
VIRIN: | 140616-Z-TD942-020 |
Resolution: | 5184x3456 |
Size: | 3.13 MB |
Location: | SPEARFISH, SOUTH DAKOTA, US |
Web Views: | 18 |
Downloads: | 2 |
This work, Danish Engineer Corps builds foot bridge within Black Hills [Image 5 of 5], by SPC joshua quandt, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.