Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Danish Engineer Corps builds foot bridge within Black Hills [Image 3 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Danish Engineer Corps builds foot bridge within Black Hills

    SPEARFISH, SOUTH DAKOTA, UNITED STATES

    06.14.2016

    Photo by Pfc. joshua quandt 

    129th Mobile Public Affairs Detachment

    Lance Cpl. Abel Frederikson and Sgt. Paw Vinther of the Danish 3rd Battalion Engineering Corps prepare to remove temperary planking on a bridge being built in Spearfish Falls in Spearfish Canyon, S.D., June 15, 2016. The Bridge will reopen the trails for tourists to have access to the falls.

    IMAGE INFO

    Date Taken: 06.14.2016
    Date Posted: 06.18.2016 13:20
    Photo ID: 2671114
    VIRIN: 140616-Z-TD942-020
    Resolution: 5184x3456
    Size: 3.13 MB
    Location: SPEARFISH, SOUTH DAKOTA, US

    Web Views: 18
    Downloads: 2

    PUBLIC DOMAIN