Soldiers from the Danish 3rd Battalion Engineer Corps begin to remove temporary boards from the support beams of the bridge construction project by Spearfish falls in Spearfish Canyon, S.D., June 15, 2016. They will be completing the foot bridge in order to reopen a hiking trail at the base of the falls.
Date Taken: | 06.14.2016 |
Date Posted: | 06.18.2016 13:20 |
Photo ID: | 2671115 |
VIRIN: | 140616-Z-TD942-032 |
Resolution: | 4193x2795 |
Size: | 2.63 MB |
Location: | SPEARFISH, SOUTH DAKOTA, US |
Web Views: | 18 |
Downloads: | 2 |
This work, Danish Engineer Corps builds foot bridge within Black Hills [Image 5 of 5], by SPC joshua quandt, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.