(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Reviving Boise’s Barber Pool [Image 166 of 226]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Reviving Boise’s Barber Pool

    BOISE, IDAHO, UNITED STATES

    11.20.2024

    Photo by Marcy Sanchez  

    U.S. Army Corps of Engineers Walla Walla District

    Marve Griffith, a planner and project manager with the Walla Walla District, U.S. Army Corps of Engineers, discusses proposed restoration efforts for the Barber Pool Conservation Area (BPCA) during a Public Scoping meeting held at the Barber Park Education and Events Center, Boise, Idaho, Nov. 20. The public scoping, part of the Barber Pool Feasibility Study, a restoration initiative focused on the BPCA, an aquatic and riparian ecosystem spanning over 700 acres, aims to rejuvenate the area’s ecosystems while enhancing public awareness and education. (241121-A-EK666-0147)

    IMAGE INFO

    Date Taken: 11.20.2024
    Date Posted: 11.24.2026 11:37
    Photo ID: 10115920
    VIRIN: 241121-A-EK666-7288
    Resolution: 4950x3536
    Size: 1.73 MB
    Location: BOISE, IDAHO, US

    Web Views: 7
    Downloads: 0

    PUBLIC DOMAIN