Newly exposed gudgeon anchor ear, which will be cut off during the outage when the new anchor plate is installed. The top of the concrete monolith is cut away to allow for the installation of grating which will enable easy inspection and access. (NA)
| Date Taken: | 11.28.2023 |
| Date Posted: | 11.24.2026 11:37 |
| Photo ID: | 10115795 |
| VIRIN: | 231129-A-QM295-1002 |
| Resolution: | 435x580 |
| Size: | 99.18 KB |
| Location: | WALLA WALLA, US |
| Web Views: | 4 |
| Downloads: | 0 |
This work, McNary Navigation Lock Gudgeon Anchor Replacement [Image 226 of 226], by Hannah Mitchell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.