The dredging began on January 5, and the contractor removed 218,286 cubic yards of sediment in less than 60 days, in 144 scow loads. This sediment was disposed in-water at a site near Bishop Bar. Work was completed before March 1, before the spring fish runs. (hannah mitchell) (230412-A-QM295-0003)
| Date Taken: | 04.11.2023 |
| Date Posted: | 11.24.2026 11:37 |
| Photo ID: | 10115754 |
| VIRIN: | 230412-A-QM295-1449 |
| Resolution: | 4000x3000 |
| Size: | 2.13 MB |
| Location: | WALLA WALLA, US |
| Web Views: | 5 |
| Downloads: | 0 |
This work, NWW dredging [Image 226 of 226], by Hannah Mitchell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.