The Walla Walla District handed construction of the Lower Monumental project to its neighboring district in July 1962. At this point, the Walla Walla District had completed the design, awarded supply contracts, and begun construction on the first cofferdam. From here, the Seattle District would have full oversight of construction. The Walla Walla District would continue to provide real estate and design support, but the dam would be built by Seattle District engineers. (hannah mitchell) (230503-A-QM295-0001)
| Date Taken: | 05.02.2023 |
| Date Posted: | 11.24.2026 11:37 |
| Photo ID: | 10115762 |
| VIRIN: | 230503-A-QM295-6576 |
| Resolution: | 600x465 |
| Size: | 49.7 KB |
| Location: | KAHLOTUS, US |
| Web Views: | 6 |
| Downloads: | 1 |
This work, lower monumental construction [Image 226 of 226], by Hannah Mitchell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.