(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Dry Dock 5 (P-209) Construction Progress: October 2026 [Image 5 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows a construction or industrial site featuring multiple large, heavily rusted steel pipes arranged in parallel rows within a trench or staging area. The pipes are marked with identifiers such as 'P9' and 'P10', suggesting sequential numbering for installation or tracking purposes. The background reveals an active construction zone with vehicles, equipment, and wooden scaffolding visible.

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    10.07.2026

    Photo by Jhewel Felipe 

    Officer in Charge of Construction Pearl Harbor Naval Shipyard

    Horizontal struts provide bracing in preparation for water removal at the Dry Dock 5 (P-209) construction site at Joint Base Pearl Harbor-Hickam, Hawaii, Oct. 7, 2026. (U.S. Navy photo by Jhewel Felipe)

    IMAGE INFO

    Date Taken: 10.07.2026
    Date Posted: 10.30.2026 14:49
    Photo ID: 10060683
    VIRIN: 261007-N-HT002-1005
    Resolution: 7008x4672
    Size: 7.45 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 248
    Downloads: 6

    PUBLIC DOMAIN