An aerial view shows the pump well under construction for Dry Dock 5 (P-209) at Joint Base Pearl Harbor-Hickam, Hawaii, Oct. 7, 2026. Once operational, the pump well will help remove water from the dry dock. (U.S. Navy photo by DHO Joint Venture Released)
| Date Taken: | 10.07.2026 |
| Date Posted: | 10.30.2026 14:49 |
| Photo ID: | 10060673 |
| VIRIN: | 261007-N-HT002-1002 |
| Resolution: | 2088x1859 |
| Size: | 2.07 MB |
| Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
| Web Views: | 205 |
| Downloads: | 6 |
This work, Dry Dock 5 (P-209) Construction Progress: October 2026 [Image 7 of 7], by Jhewel Felipe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.