(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Dry Dock 5 (P-209) Construction Progress: October 2026 [Image 2 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Aerial view of a large marine construction site featuring sheet pile cofferdams, work barges, and containment booms deployed in a waterway. The site shows active dredging or foundation work with multiple enclosed water cells and construction equipment visible. Orange containment/silt booms are deployed around the perimeter to control sediment or pollutant dispersal.

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    10.07.2026

    Photo by Jhewel Felipe 

    Officer in Charge of Construction Pearl Harbor Naval Shipyard

    An aerial view shows the pump well under construction for Dry Dock 5 (P-209) at Joint Base Pearl Harbor-Hickam, Hawaii, Oct. 7, 2026. Once operational, the pump well will help remove water from the dry dock. (U.S. Navy photo by DHO Joint Venture Released)

    IMAGE INFO

    Date Taken: 10.07.2026
    Date Posted: 10.30.2026 14:49
    Photo ID: 10060673
    VIRIN: 261007-N-HT002-1002
    Resolution: 2088x1859
    Size: 2.07 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 205
    Downloads: 6

    PUBLIC DOMAIN