(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Dry Dock 5 (P-209) Construction Progress: October 2026 [Image 1 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    An aerial view of a large active marine construction site situated along a deep-water coastline. The site features multiple dock structures, heavy construction equipment, and staging areas in various phases of development. The facility appears to be a port or harbor expansion project with significant infrastructure work underway.

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    10.07.2026

    Photo by Jhewel Felipe 

    Officer in Charge of Construction Pearl Harbor Naval Shipyard

    An aerial view shows construction progress on Dry Dock 5 (P-209) at Joint Base Pearl Harbor-Hickam, Hawaii, Oct. 7, 2026. Officer in Charge of Construction Pearl Harbor Naval Shipyard oversees the project as part of the Navy’s Shipyard Infrastructure Optimization Program to modernize Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility. (U.S. Navy photo by DHO Joint Venture Released)

    IMAGE INFO

    Date Taken: 10.07.2026
    Date Posted: 10.30.2026 14:49
    Photo ID: 10060671
    VIRIN: 261007-N-HT002-1001
    Resolution: 5734x2674
    Size: 6.22 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 270
    Downloads: 7

    PUBLIC DOMAIN