Camera Icon

Images: Cheatham Lock scheduled to reopen after major maintenance repairs [Image 3 of 7]

Photo by Fred TuckerSmall RSS IconSubscriptions Icon

Cheatham Lock scheduled to reopen after major maintenance repairs

Jimmy Reeves, center, mechanic, hammers in a wedge Nov. 13, 2012, under the watchful eyes of Ross Cunningham, left, lock and dam equipment mechanic supervisor, and Greg Cox, right, chief of maintenance section, U.S. Army Corps of Engineers Nashville District. The wedge connects the new cylinder to the rack on the upper river wall machinery at Cheatham Lock, Ashland City, Tenn. Upper river valves fill the lock chamber to lake level and lower river valves lower it to tailwater level. (USACE photo by Fred Tucker)



Web Views
11
Downloads
0

Podcast Hits
0



Public Domain Mark
This work, Cheatham Lock scheduled to reopen after major maintenance repairs [Image 3 of 7], by Fred Tucker, identified by DVIDS, is free of known copyright restrictions under U.S. copyright law.

Date Taken:11.13.2012

Date Posted:11.15.2012 12:19

Photo ID:783210

VIRIN:121113-A-HL948-006

Resolution:4288x2848

Size:6.56 MB

Location:ASHLAND CITY, TN, USGlobe

Gallery Images

Associated News

Cheatham Lock scheduled to reopen after major maintenance repairs

Options

  • Army
  • Marines
  • Navy
  • Air Force
  • Coast Guard
  • National Guard

HOLIDAY GREETINGS

SELECT A HOLIDAY:

VIDEO ON DEMAND

  • Facebook
  • Twitter
  • Youtube
  • Flickr