Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Cheatham Lock scheduled to reopen after major maintenance repairs [Image 3 of 7]

    Cheatham Lock scheduled to reopen after major maintenance repairs

    ASHLAND CITY, TN, UNITED STATES

    11.13.2012

    Photo by Fred Tucker 

    U.S. Army Corps of Engineers, Nashville District

    Cayce Tiesler, project specialist at U.S. Army Corps of Engineers Nashville District's Cheatham Power Plant, walks through the machinery house on the spillways Nov. 13, 2012. All electrical wiring and the outer housing have been replaced and the machinery covers and decking have been cleaned and painted since the May 2010 flood. (USACE photo by Fred Tucker)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.13.2012
    Date Posted: 11.15.2012 12:35
    Photo ID: 783208
    VIRIN: 121113-A-HL948-004
    Resolution: 4288x2848
    Size: 7.71 MB
    Location: ASHLAND CITY, TN, US

    Web Views: 25
    Downloads: 1

    PUBLIC DOMAIN