Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Cheatham Lock scheduled to reopen after major maintenance repairs [Image 7 of 7]

    Cheatham Lock scheduled to reopen after major maintenance repairs

    ASHLAND CITY, TN, UNITED STATES

    11.13.2012

    Photo by Fred Tucker 

    U.S. Army Corps of Engineers, Nashville District

    Terry Farrow, electrician, U.S. Army Corps of Engineers Nashville District, welds a metal “flag” for the lower river wall valve limit at Cheatham Lock, Ashland City, Tenn., Nov. 13, 2012. The lock is scheduled to reopen at 6 p.m., Nov. 15, 2012 after a one-month closure to permit major maintenance repairs to hydraulic and mechanical equipment damaged during the 2010 flood along with other routine maintenance. (USACE photo by Fred Tucker)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.13.2012
    Date Posted: 11.15.2012 12:33
    Photo ID: 783212
    VIRIN: 121113-A-HL948-008
    Resolution: 4288x2848
    Size: 7.94 MB
    Location: ASHLAND CITY, TN, US

    Web Views: 34
    Downloads: 0

    PUBLIC DOMAIN