Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Cheatham Lock scheduled to reopen after major maintenance repairs [Image 4 of 7]

    Cheatham Lock scheduled to reopen after major maintenance repairs

    ASHLAND CITY, TN, UNITED STATES

    11.13.2012

    Photo by Fred Tucker 

    U.S. Army Corps of Engineers, Nashville District

    Left to right, Greg Cox, chief of maintenance section, and Jimmy Reeves, mechanic, U.S. Army Corps of Engineers Nashville District insert the new cylinder into the rack on the upper river wall valve machinery at Cheatham Lock Nov. 13, 2012. Upper river valves fill the lock chamber to lake level and lower river valves lower it to tailwater level. (USACE photo by Fred Tucker)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.13.2012
    Date Posted: 11.15.2012 12:35
    Photo ID: 783209
    VIRIN: 121113-A-HL948-005
    Resolution: 4288x2848
    Size: 7.31 MB
    Location: ASHLAND CITY, TN, US

    Web Views: 22
    Downloads: 0

    PUBLIC DOMAIN