Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Cheatham Lock scheduled to reopen after major maintenance repairs [Image 2 of 7]

    Cheatham Lock scheduled to reopen after major maintenance repairs

    ASHLAND CITY, TN, UNITED STATES

    11.13.2012

    Photo by Fred Tucker 

    U.S. Army Corps of Engineers, Nashville District

    Billie Boyd, lockmaster at U.S. Army Corps of Engineers Nashville District's Cheatham Lock, stands Nov. 13, 2012 by the new upper land wall valve to be installed after the lock reopens. The old upper river wall valve at right was removed and replaced during a one-month lock closure to permit major maintenance repairs to hydraulic and mechanical equipment damaged during the 2010 flood along with other routine maintenance. (USACE photo by Fred Tucker)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.13.2012
    Date Posted: 11.15.2012 12:34
    Photo ID: 783207
    VIRIN: 121113-A-HL948-003
    Resolution: 4079x2848
    Size: 7.22 MB
    Location: ASHLAND CITY, TN, US

    Web Views: 40
    Downloads: 0

    PUBLIC DOMAIN