(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    King Harbor breakwater [Image 17 of 49]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    King Harbor breakwater

    REDONDO BEACH, CALIFORNIA, UNITED STATES

    09.17.2026

    Photo by Shawn Davis 

    U.S. Army Corps of Engineers, Los Angeles District

    Contractors from Connolly Pacific conduct breakwater repair work Sept. 17, 2026 in Redondo Beach, California for the U.S. Army Corps of Engineers' Redondo Beach-King Harbor breakwater repair project. The rubble mount structure is one of the largest of its kind in Southern California and is overbuilt for safety as it dissipates wave energy to mitigate against coastal erosion and enables safer vessel navigation. (U.S. Army Corps of Engineers photo by Shawn Davis, Los Angeles District Public Affairs)

    IMAGE INFO

    Date Taken: 09.17.2026
    Date Posted: 09.17.2026 17:36
    Photo ID: 9945848
    VIRIN: 260917-A-KV149-1020
    Resolution: 6000x4000
    Size: 4.69 MB
    Location: REDONDO BEACH, CALIFORNIA, US

    Web Views: 3
    Downloads: 0

    PUBLIC DOMAIN