(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Modernization efforts underway at Ice Harbor Lock and Dam [Image 3 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Three workers wearing white hard hats with red stripes are performing electrical or telecommunications maintenance work on an industrial control panel or equipment cabinet. The workers appear to be technicians or electricians collaborating on installation or troubleshooting tasks. Various tools and equipment are visible, including a multimeter and a red emergency telephone mounted on the cabinet.

    BURBANK, WASHINGTON, UNITED STATES

    08.27.2026

    Photo by Marcy Sanchez  

    U.S. Army Corps of Engineers Walla Walla District

    (From left) Derek Tate, electrician, Rhett Bawden, electrical engineer, and Casey Thomas, electrician, all U.S. Army Corps of Engineers, Walla Walla District employees, work to configure and monitor hydraulic pressure sensors associated with the turbine governor system at Ice Harbor Lock and Dam, Aug. 27. The configuration is part of ongoing modernization efforts at Ice Harbor, where three original turbine units installed in 1962 are being replaced with new, more fish-friendly turbines designed to maintain efficient hydropower generation while improving fish passage.

    IMAGE INFO

    Date Taken: 08.27.2026
    Date Posted: 09.07.2026 16:34
    Photo ID: 9914453
    VIRIN: 260926-A-EK666-1043
    Resolution: 6394x4567
    Size: 3.22 MB
    Location: BURBANK, WASHINGTON, US

    Web Views: 3
    Downloads: 1

    PUBLIC DOMAIN