MILLINGTON, Tenn. (Aug. 26, 2026) – Thor Smith, network engineer, works as a key driver of Millington Data Center infrastructure migration. The success of the infrastructure migration represents an important step toward a more integrated, and data-driven MyNavy HR enterprise designed to better support Sailors and the Fleet. (U.S. Navy photo by Douglas Bedford)
| Date Taken: | 08.26.2026 |
| Date Posted: | 09.02.2026 13:46 |
| Photo ID: | 9906581 |
| VIRIN: | 260826-N-YG354-8785 |
| Resolution: | 1920x1080 |
| Size: | 543.83 KB |
| Location: | MILLINGTON, TENNESSEE, US |
| Web Views: | 8 |
| Downloads: | 0 |
This work, Millington Data Center Infrastructure Migration [Image 12 of 12], by Douglas Bedford, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.