A concrete batch plant stands in the foreground as crews install components for a second batch plant supporting Dry Dock 5 (P-209) construction at Joint Base Pearl Harbor-Hickam, Hawaii, July 17, 2026. (U.S. Navy photo by Jhewel Felipe)
| Date Taken: | 07.17.2026 |
| Date Posted: | 07.17.2026 19:50 |
| Photo ID: | 9817972 |
| VIRIN: | 260717-N-HT002-1002 |
| Resolution: | 6868x4579 |
| Size: | 8.14 MB |
| Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
| Web Views: | 4 |
| Downloads: | 0 |
This work, Pile Driving, Batch Plant Expansion and Dewatering Preparations at Dry Dock 5 (P-209) [Image 4 of 4], by Jhewel Felipe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.