(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Pile Driving, Batch Plant Expansion and Dewatering Preparations at Dry Dock 5 (P-209) [Image 1 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Pile Driving, Batch Plant Expansion and Dewatering Preparations at Dry Dock 5 (P-209)

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    07.17.2026

    Photo by Jhewel Felipe 

    Officer in Charge of Construction Pearl Harbor Naval Shipyard

    Pump well piles stand in the foreground as crews conduct pile-driving operations for Dry Dock 5 (P-209) at Joint Base Pearl Harbor-Hickam, Hawaii, July 17, 2026. The piles will support the pump well, which will house equipment used to remove water from the completed dry dock. (U.S. Navy photo by Jhewel Felipe)

    IMAGE INFO

    Date Taken: 07.17.2026
    Date Posted: 07.17.2026 19:50
    Photo ID: 9817971
    VIRIN: 260717-N-HT002-1001
    Resolution: 6918x4612
    Size: 9.58 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 7
    Downloads: 0

    PUBLIC DOMAIN