Pump well piles stand in the foreground as crews conduct pile-driving operations for Dry Dock 5 (P-209) at Joint Base Pearl Harbor-Hickam, Hawaii, July 17, 2026. The piles will support the pump well, which will house equipment used to remove water from the completed dry dock. (U.S. Navy photo by Jhewel Felipe)
| Date Taken: | 07.17.2026 |
| Date Posted: | 07.17.2026 19:50 |
| Photo ID: | 9817971 |
| VIRIN: | 260717-N-HT002-1001 |
| Resolution: | 6918x4612 |
| Size: | 9.58 MB |
| Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
| Web Views: | 7 |
| Downloads: | 0 |
This work, Pile Driving, Batch Plant Expansion and Dewatering Preparations at Dry Dock 5 (P-209) [Image 4 of 4], by Jhewel Felipe, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.