Machinist Work Leader Corey Dunn of the FRCE Organic Manufacturing Shop observes as one of the command’s five-axis computer numerical control milling machines cuts a CH-53K King Stallion heat exchanger bracket from a solid block of metal, to ensure the process is progressing according to the part’s technical data. (Photo by Heather Wilburn, Fleet Readiness Center East)
| Date Taken: | 04.16.2026 |
| Date Posted: | 07.14.2026 13:31 |
| Photo ID: | 9810057 |
| VIRIN: | 260416-N-AC707-1027 |
| Resolution: | 5568x3712 |
| Size: | 6.45 MB |
| Location: | CHERRY POINT, NORTH CAROLINA, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, FRCE slashes bracket manufacture time to meet urgent fleet need [Image 7 of 7], by Heather Wilburn, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.