(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Project Partners Celebrate Completion of Waimomi Substation in Support of Future Dry Dock 5 [Image 6 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The image shows an electrical substation enclosed by a chain-link security fence topped with barbed wire. The facility contains high-voltage transformers, insulators, and electrical switching equipment mounted on metal structures. A 'Keep Out' warning sign is visible on the fence, and the ground inside is covered with gravel.

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    06.12.2026

    Photo by Jhewel Felipe 

    Officer in Charge of Construction Pearl Harbor Naval Shipyard

    The Waimomi Substation is pictured at Joint Base Pearl Harbor-Hickam, Hawaii, June 12, 2026. Completed in May 2026, the Hawaiian Electric Company-owned facility fulfills a key infrastructure requirement supporting future modernization projects at Pearl Harbor Naval Shipyard. (U.S. Navy photo by Jhewel Felipe)

    IMAGE INFO

    Date Taken: 06.12.2026
    Date Posted: 06.24.2026 14:17
    Photo ID: 9770446
    VIRIN: 260612-N-HT002-1006
    Resolution: 6308x4205
    Size: 10.47 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 71
    Downloads: 4

    PUBLIC DOMAIN