U.S. Air Force maintainers assigned to the 23d Maintenance Squadron work together to loosen mounting bolts during the installation of an air refueling probe on an A-10C Thunderbolt II at Moody Air Force Base, May 13, 2026. Maintainers successfully removed the stuck bolts, allowing the installation to continue. (U.S. Air Force photo by Airman 1st Class Rachel Howell)
| Date Taken: | 05.13.2026 |
| Date Posted: | 05.26.2026 14:35 |
| Photo ID: | 9707418 |
| VIRIN: | 260513-F-FB609-1282 |
| Resolution: | 8256x5504 |
| Size: | 7 MB |
| Location: | MOODY AIR FORCE BASE, GEORGIA, US |
| Web Views: | 2 |
| Downloads: | 1 |
This work, Moody Integrates First Refueling Probe on A-10 [Image 16 of 16], by A1C Rachel Howell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.