U.S. Air Force maintainer assigned to the 23d Maintenance Squadron, unscrews a bolt while installing an air refueling probe onto an A-10C Thunderbolt II at Moody Air Force Base, May 13, 2026. The refueling probe modification enhances the A-10’s ability to support combat search and rescue and close air support operations by enabling refueling from HC-130J aircraft at lower altitudes. (U.S. Air Force photo by Airman 1st Class Rachel Howell)
| Date Taken: | 05.13.2026 |
| Date Posted: | 05.26.2026 14:35 |
| Photo ID: | 9707413 |
| VIRIN: | 260513-F-FB609-1069 |
| Resolution: | 7007x4671 |
| Size: | 4.16 MB |
| Location: | MOODY AIR FORCE BASE, GEORGIA, US |
| Web Views: | 3 |
| Downloads: | 1 |
This work, Moody Integrates First Refueling Probe on A-10 [Image 16 of 16], by A1C Rachel Howell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.