(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    U.S. Navy Divers Conduct Maritime Infrastructure Repairs in Croatia [Image 3 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    U.S. Navy Divers Conduct Maritime Infrastructure Repairs in Croatia

    SPLIT, CROATIA

    05.17.2026

    Courtesy Photo

    22nd Naval Construction Regiment

    A Seabee diver assigned to Underwater Construction Team (UCT) 1, Construction Dive Detachment Charlie (CDD/C), conducts infrastructure repairs and assessments at the Port Brizine fuel terminal to restore structural integrity to a critical maritime refueling facility in Split, Croatia, May 18, 2026. UCT 1, CDD/C, currently deployed under 22 Naval Construction Regiment, is a specially trained and equipped unit within Navy Expeditionary Combat Forces, that specializes in diving, light salvage, underwater construction, and military engineering operations in austere environments.

    IMAGE INFO

    Date Taken: 05.17.2026
    Date Posted: 05.20.2026 03:45
    Photo ID: 9696824
    VIRIN: 260518-N-NO901-1003
    Resolution: 3840x2160
    Size: 1.06 MB
    Location: SPLIT, HR

    Web Views: 3
    Downloads: 0

    PUBLIC DOMAIN