Seabee divers assigned to Underwater Construction Team (UCT) 1, Construction Dive Detachment Charlie (CDD/C), conducts infrastructure repairs and assessments at the Port Brizine fuel terminal to restore structural integrity to a critical maritime refueling facility in Split, Croatia, May 18, 2026. UCT 1, CDD/C, currently deployed under 22 Naval Construction Regiment, is a specially trained and equipped unit within Navy Expeditionary Combat Forces, that specializes in diving, light salvage, underwater construction, and military engineering operations in austere environments.
| Date Taken: | 05.17.2026 |
| Date Posted: | 05.20.2026 03:45 |
| Photo ID: | 9696826 |
| VIRIN: | 260518-N-NO901-1004 |
| Resolution: | 3840x2160 |
| Size: | 557.72 KB |
| Location: | SPLIT, HR |
| Web Views: | 3 |
| Downloads: | 0 |
This work, U.S. Navy Divers Conduct Maritime Infrastructure Repairs in Croatia [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.