(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    U.S. Navy Divers Conduct Maritime Infrastructure Repairs in Croatia [Image 4 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    U.S. Navy Divers Conduct Maritime Infrastructure Repairs in Croatia

    SPLIT, CROATIA

    05.17.2026

    Courtesy Photo

    22nd Naval Construction Regiment

    Seabee divers assigned to Underwater Construction Team (UCT) 1, Construction Dive Detachment Charlie (CDD/C), conducts infrastructure repairs and assessments at the Port Brizine fuel terminal to restore structural integrity to a critical maritime refueling facility in Split, Croatia, May 18, 2026. UCT 1, CDD/C, currently deployed under 22 Naval Construction Regiment, is a specially trained and equipped unit within Navy Expeditionary Combat Forces, that specializes in diving, light salvage, underwater construction, and military engineering operations in austere environments.

    IMAGE INFO

    Date Taken: 05.17.2026
    Date Posted: 05.20.2026 03:45
    Photo ID: 9696826
    VIRIN: 260518-N-NO901-1004
    Resolution: 3840x2160
    Size: 557.72 KB
    Location: SPLIT, HR

    Web Views: 3
    Downloads: 0

    PUBLIC DOMAIN