A $115 million, two-story project underway by the U.S. Army Corps of Engineers – Far East District at Camp Humphreys, South Korea, on Dec. 23, 2025. During the winter months, construction activities are modified to withstand the cold weather in a process known as winterization such as covering doors, windows and other openings with vinyl to prevent cold air from entering and hot air from leaving to ensure appropriate temperatures for curing of materials. (U.S. Army photo by Monique Freemon)
| Date Taken: | 12.22.2025 |
| Date Posted: | 04.01.2026 03:36 |
| Photo ID: | 9593446 |
| VIRIN: | 251223-A-CQ138-1042 |
| Resolution: | 6720x4480 |
| Size: | 4.36 MB |
| Location: | CAMP HUMPHREYS, KR |
| Web Views: | 2 |
| Downloads: | 0 |
This work, Behind the Build: A look at a $115 Million Camp Humphreys Project Under Construction [Image 3 of 3], by Monique Freemon, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.