(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    51st CES conducts Rapid Osan Airfield Recovery training [Image 5 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    51st CES conducts Rapid Osan Airfield Recovery training

    OSAN AIR BASE, GYEONGGIDO [KYONGGI-DO], SOUTH KOREA

    02.26.2026

    Photo by Senior Airman Rome Bowermaster 

    51st Fighter Wing

    U.S. Air Force Senior Airman Omar Becerra, 51st Civil Engineer Squadron pavement and construction heavy equipment operator, removes excess concrete during Rapid Osan Airfield Recovery training at Osan Air Base, Republic of Korea, Feb. 26, 2026. Airmen tested a flowable fill concrete cap over crushed stone to evaluate whether the streamlined method can improve repair timelines during simulated attack scenarios. (U.S. Air Force photo by Senior Airman Rome Bowermaster)

    IMAGE INFO

    Date Taken: 02.26.2026
    Date Posted: 03.05.2026 01:27
    Photo ID: 9550099
    VIRIN: 260226-F-SA893-1210
    Resolution: 5580x3139
    Size: 1.77 MB
    Location: OSAN AIR BASE, GYEONGGIDO [KYONGGI-DO], KR

    Web Views: 5
    Downloads: 1

    PUBLIC DOMAIN