U.S. Air Force Senior Airman Delroy Williams, 51st Civil Engineer Squadron pavement and construction heavy equipment operator, breaks up ground with an excavator during Rapid Osan Airfield Recovery training at Osan Air Base, Republic of Korea, Feb. 26, 2026. The training evaluated the placement of flowable fill concrete over crushed stone using a volumetric mixer to rapidly restore limited runway capability under the Rapid Osan Airfield Recovery concept. (U.S. Air Force photo by Senior Airman Rome Bowermaster)
| Date Taken: | 02.26.2026 |
| Date Posted: | 03.05.2026 01:27 |
| Photo ID: | 9550093 |
| VIRIN: | 260226-F-SA893-1064 |
| Resolution: | 5990x3369 |
| Size: | 2.93 MB |
| Location: | OSAN AIR BASE, GYEONGGIDO [KYONGGI-DO], KR |
| Web Views: | 9 |
| Downloads: | 1 |
This work, 51st CES conducts Rapid Osan Airfield Recovery training [Image 10 of 10], by SrA Rome Bowermaster, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.