Construction is underway on the Kanopolis Lake outlet channel repair project. The project aims to prevent erosion of the outlet channel during water releases. Designed and constructed by the Kansas City District, U.S. Army Corps of Engineers, the project is expected to be complete in March 2026.
| Date Taken: | 02.09.2026 |
| Date Posted: | 02.09.2026 15:37 |
| Photo ID: | 9514285 |
| VIRIN: | 260209-A-A1408-1071 |
| Resolution: | 4000x3000 |
| Size: | 3.92 MB |
| Location: | US |
| Web Views: | 4 |
| Downloads: | 0 |
This work, Borrowing lessons from Mother Nature, outlet channel gets first major repair in over 70 years [Image 3 of 3], by Christine Reinhardt, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.