PICAYUNE STRAND, Fla. (Jan. 29, 2026) – Rob Moher, president and CEO of the Conservancy of Southwest Florida, reflects on the history of Picayune Strand—from its past as a stripped and canalized landscape to the volunteers who helped acquire the land for restoration—during a ribbon-cutting ceremony for three pump stations.
| Date Taken: | 01.26.2026 |
| Date Posted: | 01.29.2026 18:49 |
| Photo ID: | 9499188 |
| VIRIN: | 260126-A-AZ289-4791 |
| Resolution: | 12000x8000 |
| Size: | 13.55 MB |
| Location: | NAPLES, FLORIDA, US |
| Web Views: | 1 |
| Downloads: | 0 |
This work, Picayune Strand Restoration Project 2026 [Image 23 of 23], by Brigida Sanchez, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.