Dike 5 sits in the distance in the afternoon of Sept. 11, 2025. As part of the Folsom Dam Raise Project, Dike 5 will be raised by 3.5 feet in order to increase the surcharge storage of Folsom Lake in the event of extreme rain events. (U.S. Army photo by Samantha Boyle).
| Date Taken: | 09.11.2025 |
| Date Posted: | 12.31.2025 13:31 |
| Photo ID: | 9465709 |
| VIRIN: | 250911-A-VR800-5970 |
| Resolution: | 6000x4000 |
| Size: | 3.14 MB |
| Location: | CALIFORNIA, US |
| Web Views: | 2 |
| Downloads: | 1 |
This work, Work Underway at Dike 6 [Image 3 of 3], by Samantha Boyle, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.