One of the modernized hallways inside the newly completed B-Wing 495 facility at JBSA- Randolph, Texas, Dec. 4, 2025. The facility will provide expanded workspace for the Air Force’s Personnel Center teams supporting 24/7 operations for mass casualty tracking, disability processing and other mission critical operations.
The $29.7 million project, delivered by the U.S. Army Corps of Engineers Fort Worth District, consolidates critical AFPC missions while incorporating energy saving features such as insulated concrete forms, a high efficiency HVAC system, and rooftop solar panels, creating a net zero facility. (U.S. Army photo by Richard Bumgardner)
| Date Taken: | 12.04.2025 |
| Date Posted: | 12.22.2025 13:56 |
| Photo ID: | 9446832 |
| VIRIN: | 251204-A-JJ298-1694 |
| Resolution: | 3080x1622 |
| Size: | 1.45 MB |
| Location: | SAN ANTONIO, TEXAS, US |
| Web Views: | 1 |
| Downloads: | 1 |
This work, AFPC's B-495 Ribbon-Cutting Ceremony [Image 6 of 6], by Richard Bumgardner, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.