Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    One piece at a time: Tulsa District begins Tenkiller spillway bridge demolition [Image 6 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    One piece at a time: Tulsa District begins Tenkiller spillway bridge demolition

    GORE, OKLAHOMA, UNITED STATES

    12.10.2025

    Photo by Brannen Parrish 

    U.S. Army Corps of Engineers, Tulsa District

    A Kiewit construction crew member uses a power cutter to prepare a section of State Highway 100 bridge guardrail for removal, during demolition of the State Highway 100 bridge over the Tenkiller Dam spillway, near Gore, Okla., Dec. 10, 2025. The U.S. Army Corps of Engineers, Tulsa District is replacing the bridge, which rests atop Tenkiller Dam, and must be removed piece by piece. The project is expected to take from two to two and a half years.

    IMAGE INFO

    Date Taken: 12.10.2025
    Date Posted: 12.12.2025 16:31
    Photo ID: 9440112
    VIRIN: 251210-A-PO406-7860
    Resolution: 3347x3853
    Size: 3.67 MB
    Location: GORE, OKLAHOMA, US

    Web Views: 17
    Downloads: 0

    PUBLIC DOMAIN