A Kiewit construction crew member uses a power cutter to prepare a section of State Highway 100 bridge guardrail for removal, during demolition of the State Highway 100 bridge over the Tenkiller Dam spillway, near Gore, Okla., Dec. 10, 2025. The U.S. Army Corps of Engineers, Tulsa District is replacing the bridge, which rests atop Tenkiller Dam, and must be removed piece by piece. The project is expected to take from two to two and a half years.
| Date Taken: | 12.10.2025 |
| Date Posted: | 12.12.2025 16:31 |
| Photo ID: | 9440112 |
| VIRIN: | 251210-A-PO406-7860 |
| Resolution: | 3347x3853 |
| Size: | 3.67 MB |
| Location: | GORE, OKLAHOMA, US |
| Web Views: | 17 |
| Downloads: | 0 |
This work, One piece at a time: Tulsa District begins Tenkiller spillway bridge demolition [Image 7 of 7], by Brannen Parrish, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.