Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    One piece at a time: Tulsa District begins Tenkiller spillway bridge demolition [Image 1 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    One piece at a time: Tulsa District begins Tenkiller spillway bridge demolition

    GORE, OKLAHOMA, UNITED STATES

    12.10.2025

    Photo by Brannen Parrish 

    U.S. Army Corps of Engineers, Tulsa District

    Kevin Archer, quality assurance, U.S. Army Corps of Engineers, Tulsa District observes Kiewit construction crews as they prepare an excavator to remove a large section of the bridge railing during demolition of the main spillway bridge over the Tenkiller Dam, Dec. 10, 2025. The Tulsa District is replacing the 70-year-old steel bridge with a modern concrete bridge. The project will take approximately two to two and a half years to complete.

    IMAGE INFO

    Date Taken: 12.10.2025
    Date Posted: 12.12.2025 16:33
    Photo ID: 9439988
    VIRIN: 251210-A-PO406-7859
    Resolution: 2237x1598
    Size: 866.96 KB
    Location: GORE, OKLAHOMA, US

    Web Views: 18
    Downloads: 1

    PUBLIC DOMAIN