(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Foundation to Framework: Early Construction Phases Shape Old Guard Interim Stables [Image 8 of 50]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Foundation to Framework: Early Construction Phases Shape Old Guard Interim Stables

    JOINT BASE MYER-HENDERSON HALL, UNITED STATES

    09.30.2025

    Photo by Jeremy Todd 

    U.S. Army Corps of Engineers, Baltimore District   

    Construction crews conduct foundational work including concrete preparation, structural truss installation, crane operations for CONEX unit placement, interior stall wall construction, specialized rubber flooring installation, and precision welding operations during the building of the 10,000-square-foot interim stables facility at Joint Base Myer-Henderson Hall. The multi-phase construction process utilized innovative elevated platform design and modular assembly techniques to create a state-of-the-art facility for the 3d U.S. Infantry Regiment's ceremonial horses while ensuring complete removability upon project completion. The facility features 26 individual stalls engineered specifically for the 2,000-pound draft horses that conduct military funeral honors at Arlington National Cemetery.

    IMAGE INFO

    Date Taken: 09.30.2025
    Date Posted: 12.11.2025 10:18
    Photo ID: 9436436
    VIRIN: 250930-A-CT696-1237
    Resolution: 3649x5473
    Size: 4.24 MB
    Location: JOINT BASE MYER-HENDERSON HALL, US

    Web Views: 7
    Downloads: 0

    PUBLIC DOMAIN