A U.S. Airman assigned to the 39th Air Base Wing finalizes in-processing paperwork during Titan Dawn 26-01 at Incirlik Air Base, Türkiye, Oct. 20, 2025. The Personnel Support for Contingency Operations team maintained real-time accountability for all incoming personnel, ensuring mission readiness and seamless integration into contingency operations. (U.S. Air Force photo by Staff Sgt. Brieana E. Bolfing)
| Date Taken: | 10.20.2025 |
| Date Posted: | 10.30.2025 07:46 |
| Photo ID: | 9373533 |
| VIRIN: | 251020-F-VB704-1280 |
| Resolution: | 7360x4912 |
| Size: | 14.23 MB |
| Location: | INCIRLIK AIR BASE, ADANA, TR |
| Web Views: | 14 |
| Downloads: | 3 |
This work, Titan Dawn 26-01 strengthens rapid response and installation sustainment readiness at Incirlik AB [Image 19 of 19], by SSgt Brieana Bolfing, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.