U.S. Airmen assigned to the 39th Air Base Wing participate in simulated deployment processing operations as part of Titan Dawn 26-01 at Incirlik Air Base, Türkiye, Oct. 20, 2025. The Personnel Support for Contingency Operations line ensured participants were properly accounted for as part of the exercise, which tested the 39th ABW’s ability to receive forces in support of U.S. Air Forces in Europe–Air Forces Africa operations. (U.S. Air Force photo by Staff Sgt. Brieana E. Bolfing)
| Date Taken: | 10.20.2025 |
| Date Posted: | 10.30.2025 07:46 |
| Photo ID: | 9373527 |
| VIRIN: | 251020-F-VB704-1088 |
| Resolution: | 7613x5075 |
| Size: | 8.73 MB |
| Location: | INCIRLIK AIR BASE, ADANA, TR |
| Web Views: | 16 |
| Downloads: | 4 |
This work, Titan Dawn 26-01 strengthens rapid response and installation sustainment readiness at Incirlik AB [Image 19 of 19], by SSgt Brieana Bolfing, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.