U.S. Airmen assigned to the 39th Air Base Wing in-process through the Personnel Support for Contingency Operations line during Titan Dawn 26-01 at Incirlik Air Base, Türkiye, Oct. 20, 2025. The readiness exercise evaluated the wing’s capability to receive personnel efficiently while validating accountability, travel documentation, and mission readiness to support contingency operations. (U.S. Air Force photo by Staff Sgt. Brieana E. Bolfing)
| Date Taken: | 10.20.2025 |
| Date Posted: | 10.30.2025 07:46 |
| Photo ID: | 9373528 |
| VIRIN: | 251020-F-VB704-1090 |
| Resolution: | 6575x5260 |
| Size: | 12.56 MB |
| Location: | INCIRLIK AIR BASE, ADANA, TR |
| Web Views: | 17 |
| Downloads: | 3 |
This work, Titan Dawn 26-01 strengthens rapid response and installation sustainment readiness at Incirlik AB [Image 19 of 19], by SSgt Brieana Bolfing, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.