NORFOLK, Va. (July 16, 2025) — Contractors with EA Engineering conduct sediment sampling aboard a vessel at Money Point along the Southern Branch of the Elizabeth River on July 16. The results will inform the design of Phase 3 of the ecosystem restoration project.
Date Taken: | 07.15.2025 |
Date Posted: | 07.25.2025 15:31 |
Photo ID: | 9199050 |
VIRIN: | 250716-A-JA867-1090 |
Resolution: | 3000x1996 |
Size: | 5.56 MB |
Location: | VIRGINIA, US |
Web Views: | 5 |
Downloads: | 1 |
This work, USACE Hosts Stakeholders for Money Point Site Visit [Image 9 of 9], by Alysia Rigano, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.