NORFOLK, Va. (July 16, 2025) — Contractors with EA Engineering conduct sediment sampling aboard a vessel at Money Point along the Southern Branch of the Elizabeth River on July 16. The results will inform the design of Phase 3 of the ecosystem restoration project.
| Date Taken: | 07.15.2025 |
| Date Posted: | 07.25.2025 15:31 |
| Photo ID: | 9199038 |
| VIRIN: | 250716-A-JA867-1053 |
| Resolution: | 2000x3000 |
| Size: | 3.29 MB |
| Location: | VIRGINIA, US |
| Web Views: | 15 |
| Downloads: | 1 |
This work, USACE Hosts Stakeholders for Money Point Site Visit [Image 9 of 9], by Alysia Rigano, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.