The St. Louis District’s Dredge Potter dry docked at National Maintenance and Repair in Hartford, Illinois for routine maintenance. Crews replaced sections of the deck on the second level and added hatch openings to access the pipeline.
Date Taken: | 04.29.2025 |
Date Posted: | 05.02.2025 11:51 |
Photo ID: | 9010099 |
VIRIN: | 250429-A-KR238-1672 |
Resolution: | 4032x3024 |
Size: | 3.06 MB |
Location: | ST. LOUIS, MISSOURI, US |
Web Views: | 1 |
Downloads: | 0 |
This work, Dredge Potter maintenance upgrade of the second level deck panels. [Image 8 of 8], by Janet Meredith, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.