Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Dredge Potter maintenance upgrade of the second level deck panels. [Image 7 of 8]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Dredge Potter maintenance upgrade of the second level deck panels.

    ST. LOUIS, MISSOURI, UNITED STATES

    04.29.2025

    Photo by Janet Meredith 

    U.S. Army Corps of Engineers, St. Louis District - MVS

    The St. Louis District’s Dredge Potter dry docked at National Maintenance and Repair in Hartford, Illinois for routine maintenance. Crews replaced sections of the deck on the second level and added hatch openings to access the pipeline.

    IMAGE INFO

    Date Taken: 04.29.2025
    Date Posted: 05.02.2025 11:51
    Photo ID: 9010099
    VIRIN: 250429-A-KR238-1672
    Resolution: 4032x3024
    Size: 3.06 MB
    Location: ST. LOUIS, MISSOURI, US

    Web Views: 1
    Downloads: 0

    PUBLIC DOMAIN