Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Dredge Potter maintenance upgrade and remodel of the kitchen galley. [Image 6 of 8]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Dredge Potter maintenance upgrade and remodel of the kitchen galley.

    ST. LOUIS, MISSOURI, UNITED STATES

    04.29.2025

    Photo by Janet Meredith 

    U.S. Army Corps of Engineers, St. Louis District - MVS

    Josh Slater, floating plant manager onboard the Dredge Potter while in dry dock at National Maintenance and Repair in Hartford, Illinois. During this routine maintenance period to upgrade and repair the vessel, the entire galley was remodeled to include new electrical wiring, water connections, flooring, and appliance replacement.

    IMAGE INFO

    Date Taken: 04.29.2025
    Date Posted: 05.02.2025 11:51
    Photo ID: 9010093
    VIRIN: 250429-A-KR238-1671
    Resolution: 4032x3024
    Size: 3.09 MB
    Location: ST. LOUIS, MISSOURI, US

    Web Views: 1
    Downloads: 0

    PUBLIC DOMAIN