Crews install concrete structures and prepare the site for controlled low-strength material (CLSM) placement as part of the Marysville Ring Levee improvements, Marysville, Calif., Nov. 3, 2021. These installations support drainage and seepage control along the levee system.
| Date Taken: | 11.03.2021 |
| Date Posted: | 03.27.2025 21:32 |
| Photo ID: | 8940343 |
| VIRIN: | 211103-A-A1419-1001 |
| Resolution: | 1512x2016 |
| Size: | 944.43 KB |
| Location: | MARYSVILLE, CALIFORNIA, US |
| Web Views: | 12 |
| Downloads: | 1 |
This work, Marysville Ring Levee – Concrete Structures Installation [Image 16 of 16], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.