Crews excavate and construct a cutoff wall near control point 248+90 along the Marysville Ring Levee, Marysville, Calif., Sept. 7, 2024. Cutoff walls help control underseepage and contribute to overall flood risk reduction.
| Date Taken: | 09.07.2024 |
| Date Posted: | 03.27.2025 21:32 |
| Photo ID: | 8940347 |
| VIRIN: | 240907-A-A1419-1001 |
| Resolution: | 2016x1512 |
| Size: | 496.64 KB |
| Location: | MARYSVILLE, CALIFORNIA, US |
| Web Views: | 24 |
| Downloads: | 1 |
This work, Marysville Ring Levee – Cutoff Wall Construction [Image 16 of 16], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.